主营产品,备件供应,充足库存
Foxboro(福克斯波罗):I/A Series系统,FBM全系列(现场输入/输出模块)
顺序控制、梯形逻辑控制、事故追忆处理、数模转换、输入/输出信号处理、
数据通信及处理等。
Westinghouse(西屋):1C31系列DCS系统、CPU、OVATION系统、WDPF系统、
WEStation系统备件。
Triconex(英维思):冗余容错控制系统、基于三重模件冗余(TMR)结构的现代化的容错控制器。
EMERSON(艾默生):模块、卡件、驱动器等各类备件。
XYCOM:XVME系列
Bently(本特利):3500/3300系统。
Rockwell(罗克韦尔):ICS系统。
ABB:PM全系列DCS系统、IGCT高压变频器系列、工业机器人备件DSQC系列、INFI 90等。
Bailey(贝利):BRC系列DCS系统等。
Allen-Bradley:1756、1785、1771、1746全系列系统等。
Yokogawa(横河):CP系列等。
Honeywell(霍尼韦尔):TK/TC/CC系统等。
Reliance(瑞恩):57C系列等。
Schneider(施耐德):140系列处理器、控制卡、电源模块等。
Modicon(莫迪康):AS系列PLC系统备件。
Siemens(西门子):6ES5/6ES7414/6ES7415/6ES7416系列PLC系统备件、
Siemens MOORE,Siemens Simatic C1,Siemens数控系统等。
Motorola(摩托罗拉):MVME 162、MVME 167、MVME1772、MVME177等系列。
XYCOM:I/O、VME板和处理器等。
GE(通用电气):IC698/IC697全系列PLC系统、模块、卡件、驱动器等各类备件。
Yaskawa(安川):伺服控制器、伺服马达、伺服驱动器。
Bosch Rexroth(博世力士乐):Indramat,I/O模块,PLC控制器,驱动模块等。
Woodward(伍德沃德):SPC阀位控制器、PEAK150数字控制器。
Improve inspection and maintenance operation procedures and standardize operation procedures.
(2) Backup the touch screen program to restore the user program at any time in case of failure of the touch screen. At the same time, install the system program and user program for the standby touch screen, and play it plug-and-play.
(3) the logic grounding of the PLC in the disc is reinforced to ensure that the PLC is well grounded and the failure rate of the PLC is reduced.
(4) the workers are the learning time is short, lack of operation experience, professional and operational training workshop organization, in view of the large crane tube control system, main training large crane tube control scheme, the instrument principle and fault handling of knowledge, improve employee job skills and operation experience, regular test, the measures included in the workshop in the assessment of economic conditions, and strictly implemented.
(5) fiber optic sensor liquid level monitor to do a good job of a certain reserve.
9 the conclusion
Through this activity, the failure rate of the large crane tube metering loading control system has been significantly reduced and the expected goal has been achieved. On the existing basis, we still need to further reduce the failure rate of the large crane tube control system. The professional factory has reported technical reform and prepared to replace the original PLC control system with DCS distributed control system. Further improve the automation level of the large crane tube loading control system, so that debugging and maintenance more convenient, higher stability, stronger anti-interference ability and higher reliability. The most important thing is to ensure a long period of equipment, safe and stable operation.