取消

UR6TH供应工控备件供应进口卡件模块

参数
  • 工控产品产品特性
  • 是否进口
  • 美国产地
江西 瑞昌市 3天内发货 400个
瑞昌明盛自动化设备有限公司 4年
进入店铺 在线咨询
产品详情





主营产品,备件供应,充足库存

Foxboro(福克斯波罗):I/A Series系统,FBM全系列(现场输入/输出模块)

顺序控制、梯形逻辑控制、事故追忆处理、数模转换、输入/输出信号处理、

数据通信及处理等。

Westinghouse(西屋):1C31系列DCS系统、CPU、OVATION系统、WDPF系统、

WEStation系统备件。

Triconex(英维思):冗余容错控制系统、基于三重模件冗余(TMR)结构的现代化的容错控制器。

EMERSON(艾默生):模块、卡件、驱动器等各类备件。

The control process of starting and stopping can be completed by the sequence control of PLC, and it can start many motors with one soft starter. Engineering application of one soft starter to start multiple motors.

Figure 1 is the circuit diagram of starting 4 fans with a soft starter. Each fan is 45KW, and the control requirements are as follows:

1.Each fan should have two options, manual and automatic, which are set manually by switch.

2. In manual or automatic mode, the fan is started by soft starter.

3. The fan is two in use and two for standby, which can be automatically identified in the control program.

4.In the automatic operation, if the air volume of the two fans is not enough, the standby fan should be able to start manually and put into operation, and its main circuit is shown in Figure 1. The soft starter in the figure is set to soft start mode. If the fan is selected as automatic state, the starting sequence is as follows: km close → km12 close → soft start contact close (soft start start start) → km11 close → km12 open → soft start contact open → km open (# 1 fan start completed) → km close → km22 close → soft start contact close → km21 close → soft start contact open → km open (# 2 fan start completed). According to the requirements, the fans of # 3 and # 4 are started manually. When the manual start button is pressed, the above starting process should also be included. The soft start process is controlled by PLC, and the ladder diagram of soft start process control is shown in Figure 2.

M5 ~ M8 in the figure are the starting status of # 1 ~ # 4 fans in the process of automatic cycle: when M30 is in manual starting status, the combination results of starting buttons of 4 fans are shown; When M2 is valid, it enters the soft start process. Open the air valve at M80, M20 is km closed, M21 is kmn2 closed, M22 is soft start contact closed, m23kmn1 closed, M24 is kmn2 open, M25 is km open. Each state transition is completed by the time and the internal auxiliary contact of the soft starter, and its duration is determined by the time parameters of the internal timer T0 ~ T4. In the above process, n = 1, 2, 3, 4. As for which fan to start, it is decided by the identification control logic in fan selection module and combined output module. This method can also realize the soft stop of multiple motors by one soft starter. Because there is only one soft starter, when any fan starts, the rest of the starting requirements are rejected. Therefore, in the process of automatic cycle, the soft start of different motors should be set at different time periods. In the manual control, the soft start of different motors is determined by the identification control logic in the manual start module, as shown in Figure 3, and the relevant input point allocation is shown in the attached table.




为您推荐
供应商网> 工控系统及装备> PLC> UR6TH供应工控备件供应进口卡件模块
    在线问
    产品参数
    1/5
    ¥6000.00 在线咨询
    进店 客服 获取最低报价 拨打电话
    UR6TH供应工控备件供应进口卡件模块
    ¥6000.00~¥6500.00
    • 采购产品
    • 采购数量
    • 联系电话
    《服务条款》 并允许推荐更多供应商为您服务
    请阅读并同意《服务条款》